Eppenberg Tunnel (CH)
FURTHER DEVELOPMENT FOR THE EPPENBERG TUNNEL
For the first time, the static of a vacuum lifter was designed for a payload of 28'000 kg! Although the Eppenberg segment is significantly less important, Marti Tunnelbau AG invested in a future-proof and expandable system with regard to subsequent projects. With the Olten-Aarau four-lane extension (Eppenberg Tunnel), the Federal Government and SBB are repairing one of the largest bottlenecks in the Swiss Plateau. As a central element, the project comprises the new Eppenberg Tunnel, which is over three kilometres long, and extensive measures to connect it between Olten and Aarau.
Source: SBB
Scope of supply
DVL-28.0-EXT type vacuum lifting device with 90° swivel function for stripping
DVL-INT type vacuum lifting device with 90° swivel function for warehouse management
Customer
Marti Tunnelbau AG
3302 Moosedorf, Switzerland
Eppenberg construction site