DE FR EN

Belchen Tunnel North (CH)


BELCHEN TUNNEL RENOVATION PROJECT

The Belchen Tunnel along the A2, between Basel and Egerkingen, crosses the Jura mountains. A renovation of the two directionally separated dual track tunnels from 1970 is urgently needed. In order to minimize the associated traffic restrictions, the Belchen renovation tunnel (STB) is being created.

From 2016, the main tunnel work has been following, specifically the tunnelling. After the planned commissioning in 2022, the two existing, 50-year-old tunnels will be repaired one after the other. From then on, traffic will flow south through the renovation tunnel.

Source: ASTRA / Further information: belchentunnel.ch

Scope of supply
Conversion of existing vacuum lifting devices at the Balsthal (Klus) site of Marti Tunnelbau AG - payload 11,000 kg

Customer
Marti Tunnelbau AG
3302 Moosedorf, Switzerland
Belchen Tunnel North construction site

Baustelle Belchentunnel Nord

Baustelle Belchentunnel Nord

DVL-90-EXT

DVL-90-EXT

DVL-90-INT

DVL-90-INT

  • Baustelle Belchentunnel Nord
  • DVL-90-EXT
  • DVL-90-INT
  • Baustelle Belchentunnel Nord

  • DVL-90-EXT

  • DVL-90-INT

  • Baustelle Belchentunnel Nord
  • DVL-90-EXT
  • DVL-90-INT

Impressum   •   Kontakt   •   AGB  •  Datenschutzerklärung

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
More information Ok