Pipe bridge, EBL Pratteln (CH)
CONNECTING BRIDGE FOR CAPACITY EXPANSION
The eight existing heating networks in Pratteln, which are operated by EBL, are reaching their capacity limits. The construction of a new wood chip firing plant in Pratteln, with connection to ARA Rhein AG, will provide further capacities.
Scope of supply
Pipe bridge to accommodate max. 6 pipes for hot water to ensure heat exchange with ARA Rhein AG.
The pipe bridge consists of individual segments with a total length of 34.6 m.
Customer
EBL (Elektra Basel-Country Cooperative)
4410 Liestal, Switzerland