New Lift shaft AS-Aufzüge AG Wettswil (CH)


SPECIAL CONSTRUCTION FOR HISTORICAL BUILDING ON MÜNSTERPLATZ IN BASEL

The request was a glazed lift shaft in the stairwell of the City of Basel Building and Traffic Department building on Münsterplatz in Basel. All steel constructions were produced in-house and then coated and installed on the construction site. The whole "tower" is screwed in and therefore did not have to be welded or repainted on site. The total height of the lift shaft is around 15 metres.

Completion approx. March/April 2018

Scope of supply
Complete steel construction of the lift shaft including safety guard

Property
City of Basel Building and Traffic Department, Münsterplatz 11
4001 Basel

Customer
AS-Aufzüge AG
8907 Wettswil

Our SmartLift supports the DEVO team in handling and assembling the steel structure

Our SmartLift supports the DEVO team in handling and assembling the steel structure

The empty lift shaft before assembly

The empty lift shaft before assembly

The DEVO team in action - installation of the steel structure in the historic building

The DEVO team in action - installation of the steel structure in the historic building

The steel construction stands

The steel construction stands

Glazing work

Glazing work

The lift tower takes shape

The lift tower takes shape

  • Our SmartLift supports the DEVO team in handling and assembling the steel structure
  • The empty lift shaft before assembly
  • The DEVO team in action - installation of the steel structure in the historic building
  • The steel construction stands
  • Glazing work
  • The lift tower takes shape
  • Our SmartLift supports the DEVO team in handling and assembling the steel structure

  • The empty lift shaft before assembly

  • The DEVO team in action - installation of the steel structure in the historic building

  • The steel construction stands

  • Glazing work

  • The lift tower takes shape

  • Our SmartLift supports the DEVO team in handling and assembling the steel structure
  • The empty lift shaft before assembly
  • The DEVO team in action - installation of the steel structure in the historic building
  • The steel construction stands
  • Glazing work
  • The lift tower takes shape

Impressum   •   Kontakt   •   AGB  •  Datenschutzerklärung

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.